Pampanga State Agricultural University

Office of the Library Services and Museum

Development of Geographic Information System Based Road Network Map of Mabalacat City, Pampanga (Record no. 14119)

MARC details
000 -LEADER
fixed length control field 01700ntm a2200157 a 4500
001 - CONTROL NUMBER
control field 128704
003 - CONTROL NUMBER IDENTIFIER
control field 0000000000
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250408094134.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200630n 000 0 eng d
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Cubacub, Destine M.
245 00 - TITLE STATEMENT
Title Development of Geographic Information System Based Road Network Map of Mabalacat City, Pampanga
Medium [manuscript] /
Statement of responsibility, etc. Destine M. Cubacub.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Magalang, Pampanga :
Name of publisher, distributor, etc. Pampanga State Agricultural University,
Date of publication, distribution, etc. 2019.
300 ## - PHYSICAL DESCRIPTION
Extent xiii; 60 leaves + CD ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note Mabalacat City prepares for the influx of investors due to the decentralization of Metro Manila in which investors opt to locate in Clark Freeport Zone. More locators would mean greater transport demand; may it be person trips or cargoes. Being a national highway and serving as an alternative non-tolled route, Mac Arthur Highway is prone to having through traffic. This study aims to develop a GIS-based road network map of Mabalacat City, Pampanga to analyse traffic congestion with use QGIS Overlay and Proximity analysis to identify the most congested areas, determine the Level of Service of the main corridor, and suggest possible solutions. After performing proximity analysis, the researcher found out that the most congested junctions were the NLEX Extension/MNR and the Velasquez St./MNR Intersection. With the conducted of peak hour volume survey, corresponding values to V/C ratio all fell under level F. This means the government must take action to mitigate the traffic congestion along the Mabalacat main corridor.
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
      Not for loan PSAU OLM PSAU OLM Dissertation, Theses 06/30/2020   UT C96 2019 UT11485 04/08/2025 04/08/2025 Theses